Bricks and blocks

With the foundations and floors in place we can begin to build the walls of the main structure.
Lots of block and bricks have been loaded out on the beam and block floors ready for the Brickies to build up the external and internal walls.

Brickwork underway
Here’s the result of some hard work from the Bricklayers – after the frost and snow had put a temporary stop to their work.

first floor joists
We are now up to first floor level so the window and door lintels can go in. Then then the first floor wood and metal joists were put in position.

Brickwork first floor
The house rising up from the ground, as viewed from the West by our Beagle dog.

East side rear 2011-01-14
Viewed from the east rear the first lift of the scaffolding is now in place.

Kitchen 2011-01-23
An internal view of what will be the the kitchen area, with the utility area off to the right hand side.

Hallway internal blockwork
Here is the internal block work of the hallway, the shower room and the kitchen at the rear.

Telehandler
More insulating blocks needed – oh what fun!

Wall ties no cold bridging
Thousands of metal wall ties can lead to heat leaking from the inside to outside (cold bridging). These wall ties are very long due to the 165mm cavities, but are made of basalt with a very low thermal conductivity. The black rubber rings prevents water tracking along them and forces it to drip off.

House from west 2011-02-11
New brickwork as viewed from the west side.

First floor build is starting
Viewed from the rear, the brickwork is up to first floor level now plus the low conservatory walls are now in place.